翻訳と辞書
Words near each other
・ Folliott Sandford
・ Folliott Sandford (priest)
・ Folliott Sandford Pierpoint
・ Follis
・ Follis (disambiguation)
・ Follistatin
・ Follistatin-related protein
・ Follmanniella
・ Follmer, Clogg and Company Umbrella Factory
・ Follo
・ Follo (newspaper)
・ Follo Arbeiderblad
・ Follo District Court
・ Follo FK
・ Follo Folk High School
Follo Line
・ Follo, Liguria
・ Follonica
・ Follonica Airfield
・ Follonica Hockey
・ Follow
・ Follow (disambiguation)
・ Follow / Swallow
・ Follow a Star
・ Follow Blind
・ Follow focus
・ Follow Follow
・ Follow Follow (fanzine)
・ Follow for Now
・ Follow for Now (album)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Follo Line : ウィキペディア英語版
Follo Line

The Follo Line ((ノルウェー語:Follobanen)) is a planned high-speed railway between Oslo and Ski, Norway. Running parallel to the Østfold Line, it will be engineered for . Terminal stations will be Oslo Central Station and Ski Station. Most of the line, , will be in a single tunnel, which will be the longest railway tunnel in the country. Construction is estimated to start in 2014, and may be completed by 2020/21.〔(Jernbaneverket 2011: ''Alternativ innføring av Follobanen til Oslo S skal utredes'' )〕 The Follo Line will increase capacity from twelve to forty trains per hour along the South Corridor, and will allow express and regional trains to decrease travel time from Ski to Oslo from 22 to 11 minutes. The line is prospected to cost over 20 billion Norwegian krone (NOK).
The project is a continuation of the Norwegian National Rail Administration's plan to build four tracks along the three main corridors out of Oslo; the Gardermoen Line was completed in 1998, and the Asker Line has been completed in 2011. Between 1989 and 1996, the Østfold Line south of Ski to Moss was upgraded to double track and higher speeds. To take full advantage of this and allow the rest of the Østfold Line to be upgraded for high speeds, it is necessary to increase capacity through the bottleneck from Oslo to Ski. The first plans for the Follo Line were launched in 1995, and also included an intermediate station at Vevelstad and Kolbotn. The new line is predicted to increase rush hour rail ridership 63%, and increased freight on rail would remove 750 trucks daily from European Route E18.
==Background==
The first railway in the Follo district was the Østfold Line of the Norwegian State Railways (NSB) that opened on 2 January 1879, between Oslo East Station and Halden. Later the same year, the line was extended to the Swedish border, where it connected to the Norway/Vänern Line. The importance of Ski Station increased on 24 November 1882, when it became the station where the Eastern Østfold Line split, and went via Inner Østfold to Sarpsborg, where the two lines reconnected. Electrification of the section from Oslo to Kolbotn was completed on 18 January 1937, and the section to Ski finished in 1939; the whole Østfold line was completed in 1940. Between 1924 and 1939, NSB built double track along the route between Ski and Oslo. From 1989 to 1996, NSB upgraded the track to double track from Ski to Sandbuka, just north of Moss. This section is capable of speeds of , however the maximum is due to short distances between stops and limitations of the rolling stock.
In 1992, the Norwegian Parliament decided to build the first high-speed railway in Norway, from Oslo via the new Oslo Airport, Gardermoen to Eidsvoll. This line would run parallel to the Hoved Line, increasing the speed and capacity along the route. Fast express and regional trains could run along the new section, while slower commuter trains used the old tracks and could make many stops without disturbing other traffic. Projects were launched during the 1990s to create similar high-speed bypasses from Oslo to Ski, and from Skøyen (west of Oslo) to Asker. Construction of the latter—christened the Asker Line—started in 2001, and the first section from Asker to Sandvika opened in 2005, while the second section is expected to open in 2011.
The Østfold Line between Oslo and Ski remains the largest bottle-neck on the Norwegian railway network. The line restrains the track to twelve trains per hour (six per direction) and hinders freight trains from using it during rush hour. The bottleneck occurs because there are up to four trains each hour making stops at all stations, and these stops delay all express and regional trains that follow. Travel time is 22 minutes for direct trains to Ski, and 31 minutes for commuter trains with a speed limit of along most of the line. Capacity on the upgraded double track from Ski to Moss cannot be fully utilized due to the limitations along the section from Ski to Oslo, and further growth in the number of freight trains along the South Corridor to Sweden and Continental Europe is impossible without reducing the number of passenger trains.
Despite the existing double track all the way from Oslo to Moss, a further upgrade southwards will not be able to increase capacity past the current single train per hour to Fredrikstad, Sarpsborg and Halden. The most optimistic plans involve finishing the first upgrades of track south of Moss simultaneously with the Follo Line. The Rail Administration and Ministry of Transport is working on proposals for a high-speed railway between Oslo and Gothenburg in Sweden. This line would most likely use the Follo Line for the initial distance from Oslo.